SAM HOUSTON BLVD. WIDENING PHARR, TEXAS

Contract Date: 7/12 – 7/13
Construction Cost:
Funding Source:
Client: City of Pharr

This project involved the widening of an existing roadway into a two-lane roadway that included left and right turn lanes fronting schools.

The project scope included pavement and drainage design as per TxDOT standards and specifications.  SAMES, Inc. project managers also submitted review procedures that included the completion of an environmental study for the proposed improvements.

Additionally, this project required utility adjustment design plans for multiple entities along Sam Houston Blvd. right-of-way.  These plans were incorporated into the Roadway and Drainage plans. Our team also prepared right-of-way maps as required by TxDOT for the acquisition of 25 parcels along the improvements.

Our project responsibilities and capabilities are as follows:

  • Plan & Spec Preparation
  • Surveying
  • Roadway Design
  • Drainage Design
  • Project Management