STARR COUNTY PAVING AND DRAINAGE IMPROVEMENTS ,TxGLOROUND 2 Precincts 1, 2, 3, and 4

Contract Date: 2011
Construction Cost: $844,000.00
Funding Source: Texas GLO Hurricane Dolly Disaster Recovery Program, Round 2
Client: County of Starr
Judge Eloy Vera
100 N. FM 3167
Rio Grande City, TX. 78582
(956) 716-4800

This project involved the design and reconstruction of 17 streets within all four precincts of Starr County and is as follows:

Muñoz Area and MiRanchito Area (Precinct 1):

  • Sacred Heart Drive
  • Sendero Road

Salineño Area (Precinct 2):

  • Old School Road
  • E. Castillo Street
  • N. Old Church Street
  • Iglesia Street
  • Salineño Road
  • S. Old Church Street
  • A. Canales Road

El Chaparral Area (Precinct 3):

  • San Augustine Street
  • San Bernardo Street
  • Santa Maria Avenue
  • El Chaparral Street

Las Lomas Area (Precinct 4):

  • Guerra Street
  • Juares Street
  • Hinojosa Street
  • Nacaquita Street
  • JM Martinez Street (drainage only)

Our project responsibilities and capabilities are as follows:

  • Site visits and Planning
  • Topographical surveying
  • Preliminary Design and Schematics
  • Hydraulics Design
  • Budget Analysis

  • Scheduling
  • Plan and Specifications preparation
  • Bid Packet Preparation and Bid Procurement
  • Construction Administration